Brief:
The Iona College project involved the construction of a three-story building which houses the facilities for Year 7-10 students. With a 1,700m2 footprint, the concrete to complete the ground slab, first floor slab, second floor slab, 3 sets of tiered viewing seats and 4 sets of internal concrete stairs came to a total of 2,350m3, and with the reinforcement totaling at 280 tonnes.

  • Time Frame: TBA
  • Budget: TBA
  • Size: TBAm²