Debono Bros Concreting Logo - Geelong Concreters

Brief:
Ocean Grove Surf Lifesaving Club was a project situated on the beachfront which involved the demolition of the previous buildings and the construction of 2 levels of concrete slabs (Ground Slab and First Floor Slab) which totaled to 1,200m3 of concrete and 120 tonnes of reinforcement. To combat issues with the excavation of the 1,500m3 of sand, Debono Bros formed all edge and internal beams with lost formwork.

  • Time Frame: TBA
  • Budget: TBA
  • Size: TBAm²