Brief:
This project at Saint Ignatius College involved 2 buildings, a Basketball Stadium (2,400m2 slab) and Year 9 Building (1,200m2). The scale of this project meant that Debono Bros had to remove 1,800m3 of soil from the job site. The job required Debono Bros to ensure that the Stadium slab was at a level to ensure the high grade of timber flooring laid on top for the stadium’s basketball court.

  • Time Frame: TBA
  • Budget: TBA
  • Size: TBAm²